JIRA Ticket system
JIRA Ticket system
Product Team
Issue types
– It can vary from product to product but the basics - will remain the same.
|
|
JIRA Ticket SystemEpics
Adding Due dates is mandatory. StoryStory format (As a <persona>, I want <some goal>, So that <some reason>) - Mandatory Format Each Story will have following items. (mandatory otherwise Sprint won’t be kicked off.) Documentation(use cases, UI UX design; it will be 1st approved then kicked off) A Parent issue (an Epic) attached to it. Story point estimate Design attached if Required. Due Date Fix Version Sprint Labels to identify client (if more than one) + one of these label is mandatory(Product-Development OR Client-Requirement) Done Criteria/Acceptance Critaria 1 Story Point=1Day=8Hrs – 0.5 SP= 4Hrs – 0.25 SP = 2Hrs Story Shouldn’t be more than 4 SPs, if more than 4 SPs then it should be divided into two parts. Each Developer will be assigned Maximum 8 Story Points in a Sprint (if 100% dedicated) BugsBugs are reported by the QA. Each bug will have a Parent issue(an Epic) assigned to it. (if they are independent Bugs) linked with its relevant story/task If the bug is related to some story, create a subtask under the main ticket, don’t forget to mention all the labels, fix version, due date, Quarter, etc. After adding a subtask(as a bug) comment on the main story, attach the subtask link, and Reopen the ticket. Due date Fix Version Labels (New-issue, Regression-bug, known-issue) Use Case Reporoducing steps Screenshot or Video (using tools http://screencast.com or Free screen recorder for Mac and PC | Loom PerfectPixel by WellDoneCode use this google extension for comparing websites (testing on layer basis) Most Reliable App & Cross Browser Testing Platform - (will buy Paid version - tickets will dreactly created from the app.)https://shopdev.atlassian.net/l/c/RX17U2Kx Application Performance Monitoring & Error Tracking Software (will buy Paid version - Integrated with JIRA.) HotfixesUrgent issues can be directly deployed to any environment. Each bug will have a Parent issue(an Epic) assigned to it, linked with its relevant story/task, Due date, Fix Version, Acceptance Criteria are mandatory. SubTasks If issues are related to some story, they are supposed to be created as subtasks, under a story. (all fields are supposed to be filled) Can be created by clicking child issue, Jira doesn’t allow a sprint to be closed in the mentioned case. |
Documentation - UI UX DesignAll tasks should be tracked on the JIRA board Design either made on Figma or Adobe Xd should be embedded with the ticket. https://shopdev.atlassian.net/wiki/spaces/SPM/pages/1713832944https://shopdev.atlassian.net/wiki/spaces/SPM/pages/1713833169 Due dates, Story points are mandatory. Product Managers will create Wireframes, Use cases, and User flow/journey. A document for design decision will be created 1st and then further work will be done. https://shopdev.atlassian.net/wiki/spaces/SPM/pages/5070192850 |
Adding Epic(parent issue) is Mandatory in any case.
, multiple selections available,
Related content
How to Setup a New Project on JIRA
How to Setup a New Project on JIRA
More like this
How to Integrate Slack with your JIRA Project
How to Integrate Slack with your JIRA Project
Read with this
Day End Updates - Standup Tool - Dixi App
Day End Updates - Standup Tool - Dixi App
Read with this
How to Create WorkFlows
How to Create WorkFlows
More like this
How to create Sprint End Report and Sprint Kickoff Plan
How to create Sprint End Report and Sprint Kickoff Plan
Read with this
Project Management By Ammar Ahmed Butt
Project Management By Ammar Ahmed Butt
Read with this